A Small Project for Snowy Days

 

Matt, the Summer Farm Assistant, was available for a couple days of work so we got a few small projects underway. Gus, the wonder/demon dog, has entered the terrible teen dog stages and figure how to scale the only three foot section of his fence along the front of the cabin. A makeshift 4 foot fencing held him in temporarily but didn’t look the best. To clean it up a bit Matt built 4 foot panels of proper fencing to replace the multi 3’ 4’ welded wire fencing  . Unfortunately the snow and cold invaded before we could install the panels.

Additionaly he was able to clear the remain perimeter fence line so the last of that fencing can get installed if and when Spring does arrive.

This entry was posted in Uncategorized. Bookmark the permalink.